Curing of Makiga Blocks

Soil Block Press Machine
Makiga Stabilized Interlocking Soil Block Press Machines
April 12, 2021
Makiga Curved interlocking
April 25, 2021
Show all

Curing of Makiga Blocks

Stacking Blocks

Stacking the Interlocking Blocks

Makiga Blocks are not burnt. They are cured for 14 days.

Curing method:

  • The blocks are covered to protect them from direct sunlight.

  • The blocks are then watered twice a day. In the morning and evening for 7 days.

  • Blocks are stacked after 4 days while covered to allow space for other blocks and also for easy management. After stacking on the 4th day continue watering and covering until the 7th day.

  • When curing process in over the blocks are left for another 7 days before being sold or used for building. This means that it takes a minimum of 14 days to start using the blocks.

Written by  :

Grace Kiroko Kinya

grace.kiroko@makiga-engineering.com

Share and Enjoy !

0Shares
0 0
FacebookTwitterInstagram
× Interested in makiga interlocking